b'Before you get started 5 simple steps to professional pavingInspect paving on delivery* Always check the paving on delivery and before you start1Dig out ground 150mm.laying. If you are going to be away from home while the paving is laid by a contractor, make sure you are happywith every paver. 2Compress sub-base 100mm. 4Apply slurry primerIf absent during installation ALWAYSto back of paver.inspect paving before going away.* Dry lay before laying permanently3Lay FULL bed of 5Lay paving the Essential to make sure the paving ts the area to mortar 30-50mm. correct way up and be laid. Especially where dimensional accuracy isDO NOT USE SPOT METHOD. space correctly. required, such as circle kits.NEVER BUTT JOINT.Now youre ready to startCleaning up & sealingLay from different packs ALWAYS lay on a full bed of mortar. to blend colours.This will ensure full contact is made to the paver providing a much stronger patio. NEVER use acid to clean paving. Draw randomly from different packs/crates This will damage the paving. Always use a to assist colour blending.recommended proprietary cleaner. NEVER use the spot bed method. This will create voids which attract insects and We recommend priming thevermin. The paving will be also be susceptible to back of Natural Stone andfracture when loaded and can cause stainingSee page 128 for our range of Porcelain paving with a slurryissues. Paving laid with any void bedding willsealants & cleaners.primer.invalidate any guarantees. This improves the bonding strengths and will extend the lifespan of your project.Tap pavers to make full contact with the mortar. Using a rubber mallet, tap the pavers making sureVisit www.pavestone.co.uk/installationSpace out paving to they are the correct level.for more informationcorrect width. Paving should be spaced to even Natural Stone Chamfered edges. Lay paving *When paving has been installed, it is deemed that out joint widths. the correct way up.the product has been checked and accepted. NEVER butt joint. Chamfer down Natural stone is hand cut. The top edge will bePavestone do not accept any liability if the product Concrete clean and straight with the bottom much rougher.has not been inspected prior to installation.Concrete comes out of a mould, with the detailed face on the smaller side. Chamfer up PAGE 143'